1 to 15 of 15
Sort by: Date | Relevance
Full time, hybrid, 2 3 days/week in office Candidates will need to be local to St. Pete or willing to relocate at their own expense. Candidates must be familiar with STAR method of interviewing (situation, task, action, result). Candidates should be prepared for this and familiar with what that means. Failure to be able to answer those questions could result in candidates
Posted Today
Full time, hybrid Worker can sit at Dana Ops, Raleigh NCRH, Charlotte Duke Energy Plaza, or St. Petersburg DEF HQ GIS Analyst SR Data Analysts support the operation, maintenance and/or construction of the electric power delivery system by maintaining, reporting, and analyzing data from a number of data systems within their assigned area. Senior Data Analyst is the highest
Posted 4 days ago
Perform design of electrical high voltage substations using AutoCAD with a familiarity with 3D design using Inventor software. Ensures accomplishment of project goals and objectives through effective planning and self organizing of work activities. Independently prepares physical electrical and civil engineering drawings packages using departmental procedures and engineer
Posted 4 days ago
Details The position requires physical endurance for tasks such as walking the site, taking samples, performing FSS surveys, and may require lifting up to 50 pounds. The ability to wear a PAPR for 70% of the workday is also required for this role.
Posted 6 days ago
position is typically retained to manage multiple 'Green I' or 'Green II' projects per the Project Management Center of Excellence Project Profile Matrix. The Project Manager may have relationships with individuals in various organizations ranging from individual contributors to Senior Department Leadership (i.e. individual contributors up to executive management). Requir
Posted 6 days ago
Workers at this level are responsible for performing complex aspects of individual projects estimating, scheduling, change documentation and cost control while reporting up to program or portfolio level with minimal supervision. Workers are expected to develop advanced skills and to have the ability to work independently, with guidance limited to unusual or complex projec
Posted 7 days ago
Create / Staff / Lead Project Team. Provide leadership, oversight management, delegation, and coordination to the various internal and external organizations that are providing services to the project (development, engineering, project controls, estimating, construction management, supply chain, legal, EHS, QA/QC, operations, communications, regulatory, security, fuels, t
Posted 9 days ago
Full time, hybrid, 2 days/week in office Will drive personal vehicle if needed to sites, mileage reimbursed. This position would be responsible for conducting P&C Design QA reviews with external contractors of high level projects. These projects would include major reliability upgrade projects at Transmission level substations and generation plants. This position would ne
Posted 10 days ago
SrPC Scheduler Additional details PPE is required for occasional field visits. We are requiring our Project Controls Specialists to visit project sites at least once a quarter. The following PPE is required Hard hat, protective eyewear and the following must be purchased by the CW/Supplier flame retardant clothing, steel/composite toed footwear. This is a scheduler role F
Posted 10 days ago
Full time, first six weeks will be fully onsite, then will be hybrid and need to report 3 days/week in office Provide drafting expertise using Bentley Microstation to create and update Enterprise diagrams and schematics related to the electrical distribution and transmission infrastructure. Candidates are expected to have expert level CAD skills including experience with
Posted 13 days ago
& Duties Assist operations center management with day to day scheduling of construction work to be performed by both company and/or contract crews. Schedule and/or assign work based upon priority of work to be done and time required for completing tasks. Coordinate work assignments and schedules of contract crews. May audit completed work of contract crews. Coordinate with
Posted 14 days ago
Strong P6 Scheduling experience is a preferred! This is the expert level of the Project Controls classification hierarchy. Workers at this level lead the development of the reporting systems for project controls assignments. They perform complex aspects of individual project estimating, scheduling, change documentation and cost control while reporting up to program or por
Posted 23 days ago
include ensuring that new station designs provide an electrical and control plan that accomplishes the scope of the project and adheres to NGBU standards. A Controls Engineer will typically be a project team member for multiple concurrent projects. Gas plant projects may range from equipment modification or replacement to complete plant construction or decommissioning. Con
Posted 28 days ago
This is the intermediate level of the Project Controls classification hierarchy. Workers at this level are responsible for initiating and completing routine aspects of project control assignments with general oversight. Workers effectively apply fundamental project controls principles and procedures to work that is fairly complex and varied. They have an understanding of
Posted 28 days ago
Full time, hybrid Assists with processing and distributing fleet, site, and section administrative and technical procedures to ensure safe and efficient operation in compliance with all required guidelines and regulations. Ensure procedures are classified, indexed, sorted, filed, and retrieved electronically or via hardcopy in accordance with required programs and procedu
Posted 29 days ago
Email this Job to Yourself or a Friend
Indicates required fields